Project Coordinator Data Centre Construction
4Front Recruitment Ltd
£45,000 - £50,000 per annum
Project Coordinator Data Centre Construction at 4Front Recruitment Ltd, based in Bath, South West, paying £45,000 - £50,000 per annum. This is a contract role.
- Pay
- £45,000 - £50,000 per annum
- Hours and contract
- Contract · On site
- Location
- Bath, South West
- Sector
- Data Entry
8% below the typical rate for data entry
Reference vacancies/9573863-project-coordinator-data-centre-construction
About the role
Bristol | £45,000–£50,000 | Permanent
Enjoy keeping construction projects organised and making sure everything runs smoothly?
We're recruiting for an established specialist contractor delivering complex construction projects across the data centre, defence and energy sectors.
You'll initially join the team working on Phase 2 of a data centre refurbishment and expansion in Bristol, increasing IT capacity by 2.4MW with new electrical and mechanical infrastructure.
This is a great opportunity for an experienced Design Coordinator who enjoys working with different teams, keeping information flowing and making sure projects stay on track.
What will you be doing?
Working closely with the Design Manager, engineers, consultants and subcontractors, you'll help coordinate design information throughout the project.
Your responsibilities will include:
• Coordinating drawings, design submissions, reviews and approvals.
• Maintaining design registers, trackers and outstanding actions.
• Monitoring deadlines and following up information to keep the programme moving.
• Supporting design meetings and coordinating information between project teams.
• Identifying missing information or potential delays before they become problems.
• Supporting design documentation through to project handover.
What we're looking for
You'll have experience in construction, engineering or design coordination and understand how design information moves through a project.
Ideally, you'll bring:
• Experience coordinating construction drawings, design information and project documentation.
• Good organisational skills and the confidence to follow up with consultants and subcontractors.
• An understanding of construction design processes and project deadlines.
• Experience using Common Data Environments (CDEs) or similar project systems would be beneficial.
You don't need to be an engineer or a Design Manager. We're looking for someone who enjoys the detail, communicates well and takes pride in keeping everything organised.
What's on offer?
£45,000–£50,000 salary
• 25 days' holiday plus bank holidays and your birthday off
• BUPA healthcare and cash plan
• Competitive pension scheme
• Car allowance for eligible roles
• Electric vehicle and cycle-to-work schemes
• Eyecare vouchers
Interested?
If you're an experienced Design Coordinator looking to get involved in technically interesting construction projects with an established specialist contractor, we'd love to hear from you.
Apply today or contact 4Front Recruitment for a confidential conversation.
Reference: vacancies/9573863-project-coordinator-data-centre-construction · Posted 2 days ago · Listed via 4Front Recruitment Ltd · Original advert
Safe applying: a genuine employer will never ask you to pay for a DBS check, training or equipment, or move you onto WhatsApp before you are hired. If this listing does, report it and do not pay anything.
Report this job
Is this your vacancy?
If you are the employer or recruiter, you can put this advert at the top of matching searches. It is labelled Boosted while it runs.
- Boost one job, 7 days £29 per job
- Boost one job, 14 days £49 per job
- Boost one job, 30 days £79 per job
Ordered by invoice and paid by bank transfer. No VAT is charged.
It costs nothing to manage your adverts here. List your jobs with us
Did you apply?
Your answer stays on this page. We do not record it.
Good luck with it. Save the job so you can find it again.
No problem. Save it and come back when you are ready.